This website uses cookies

On our website we use technical, analytical, marketing and preference cookies. These are necessary for our site to work properly and to give us information about how our site is used. Our Cookie Policy.
Skip to main content
460k land Job- Case study edit
Electric Powerpack
  • Less Noise
  • Fewer emmissions
  • Less downtime
  • Lower cost
Flori Cultura

Our latest generation of electric powerpacks are helping to reduce the carbon footprint of our operations. Not only do the electric powerpacks reduce our on onsite CO2 emmisions to zero but they also dramatically reduce noise emmissions to an almost inaudible level- great news for our crews and perfect for wellsites in urban areas.

The high reliability of the electric units reduces downtime and helps to improve the overall efficiency of our operations.

A traditional diesel powerunit could consume up to 1500 litres of diesel per day, which results in a lot of noise, a lot of diesel smoke and a high daily cost.