Electric power for reduced emmissions
Two gas platforms in the Celtic Sea had reached the end of their economic life. WellGear mobilised a 340k and a 460k Unit to plug and abandon their wells.
When a blocked completion prevented a well from being killed, the WG003 HWO was mobilised to pull the completion live and then kill the well.
Plug and abandonment of all wells on a Dutch Sector oil platform
Six artificially lifted wells, in need of workover, on a platform with no derrick. WellGear 460k Hydraulic Workover Unit succesfully replaced all six ESPs.
Successful recovery of 45 North Sea conductors, working simultaneously with the platform derrick.
During a P&A campaign on a UK North Sea oil and gas platform, several wells required a perf wash cement (PWC) to set a safe environmental barrier.
Poor quality cement through a reservoir interval required remedial work to allow a successful isolation