This website uses cookies

On our website we use technical, analytical, marketing and preference cookies. These are necessary for our site to work properly and to give us information about how our site is used. Our Cookie Policy.
Skip to main content
1604675947710

One of the greatest snubbing challenges is pipe buckling between the travelling and stationary slips.


Our standalone 225K Concentric Unit for onshore and offshore snubbing and workover operations solves the problem. A concentric jack enables the jointed pipe to be efficiently and safely snubbed in whole – with no buckling.

The modular unit is designed for efficient rig up and is also ideal for frac plug milling and thru-bore operations.

Concentric snubbing cropped

Increased efficiency

  • Modular concept, guide and pin assembly reducing set-up and rig down times
  • Free-standing, no guy wires

Specifications

Pull Capacity Push Capacity Stroke Thru-bore CB Winch Pull Capacity
225,000 Lbs 100,000 Lbs 16 ft 7-5/8" 3,300 Lbs

Case Studies